Pasing Grades
  • Start Selling
  • Blog
  • Contact
  • 0

    Your cart is empty!

English

  • English
  • Spanish
  • Arabic
Create Account Sign In
  • Library
    • New Prep Guides
    • Featured Prep Guides
    • Free Exam Prep Guides
    • Best sellers
  • General
  • Nursing
    • Research Paper
    • Case Study
    • Discussion Post
    • Assignment
    • Exam
    • Practice Questions and Answers
    • Test Bank
    • solutions manual
  • Accounting
    • Case Study
    • Thesis
    • Study Guide
    • Summary
    • Research Paper
    • test bank
  • English
    • Creative Writing
    • Research Paper
    • Summary
    • Rhetorics
    • Literature
    • Journal
    • Exam
    • Grammar
    • Discussion Post
    • Essay
  • Psychology
    • Hesi
    • Presentation
    • Essay
    • Summary
    • Study Guide
    • Essay
    • Solution Manual
    • Final Exam Review
    • Class Notes
    • test bank
  • Business
    • Lecture Notes
    • Solution Manual
    • Presentation
    • Business Plan
    • Class Notes
    • Experiment
    • Summary
    • Practice Questions
    • Study Guide
    • Case Study
    • test bank
    • Exam
  • More
    • Computer Science
    • Economics
    • Statistics
    • Engineering
    • Biology
    • Religious Studies
    • Physics
    • Chemistry
    • Mathematics
    • History
    • Sociology
    • Science
    • Philosophy
    • Law
  • Pages
    • About Us
    • Selling Tips
    • Delivery Policy
    • Faq
    • Privacy Policy
  • Flash Sale
  • Home
  • Blog

Reflection on Convey Three Levels of Maturity

Reflection on Convey Three Levels of Maturity

Reflection on Convey Three Levels of Maturity

Last updated 01 May 2021

0

1240

At what point in the project, if any, did I find myself thinking, behaving, or in a way that appeared dependents

A project being a series of responsibilities that requires to be completed to reach a specific goal. It also has some factors that have to be applied for it to be effective. A project can be defined as a set of inputs and outputs required to achieve a precise goal. The project requires financial stability for it to utilize a variety of sources to get information. Sometimes as I was conducting a field study, I realized that much is needed, yet I had a little top-up for the project. In connection to convey tree level of maturity, this comes in the second level, which suggests that a project with level 2 maturity is widely accepted since there is some initiative to establish (Hemon 2018). In the project conducted, I needed remarkable resources to ensure that the content is not outdated, transport from one place to another, and some compensation for the participant who will participate in the project. When conducting the project, I needed financial support from friends, relatives, and family members to finance the whole process.

At what point in the project, if any, did I find myself thinking, behaving, or in a way that appeared independently

Above all, not everything in the project needs support. One needs to be independent in designing most of the basic factors of a given project. Among the things, I felt no help needed from anyone in designing the projects’ goal. What do I need to achieve, and where do I need the information? Defining the scope of the projects required my knowledge and understanding of the study. Not every participant on the project needs to understand the aim of the project and its benefit. This was the first level of the project, which according to the conveys three levels of maturity, the project at this level is not very mature in its approaches (Hemon 2018).

Did I ever feel that I was working independently with my group?

Working as a group is important, most probably in sharing information. Again, tiresome due to some disagreements from the group’s members. The project was to take approximately seven days. In the first three days, we worked as a group, but the members seemed tired from the fourth day, and I felt as the load was left on my side.

Reference

Hemon, A., Lyonnet, B., Rowe, F., & Fitzgerald, B. (2018, June). Conceptualizing the transition from agile to DevOps: A maturity model for a smarter IS function. International Working Conference on Transfer and Diffusion of IT (pp. 209-223). Springer, Cham.

Share this post

0 Comments

Leave A Reply

Categories

  • Study Guide 41
  • Student Knowledge Base 33
  • Assignment 38
  • Analysis 12
  • Case Study 15
  • Exam 24
  • Flashcards 38
  • Cornerstone 20
  • Essay 276
  • Research Papers 44
  • Reviews 35
  • Free Test Bank 77
  • Questions & Answers 92
  • Popular Posts
  • Latest Posts
  • The “Grandma’s Kimchi” College Essay

    The “Grandma’s Kimchi” College Essay

    11 August 2025

  • Mastery EAQ Delegation

    Mastery EAQ Delegation

    29 July 2025

  • Brunner and Suddarth 16th Edition Test Bank PDF – Medical-Surgical Nursing Practice Questions & NCLEX Prep Guide

    Brunner and Suddarth 16th Edition Test Bank PDF – Medical-Surgical Nursing Practice Questions & NCLEX Prep Guide

    29 January 2026

  • AP Exam Dates: Full Schedule, Late Testing, and Important Deadlines

    AP Exam Dates: Full Schedule, Late Testing, and Important Deadlines

    07 November 2025

  • Bontrager’s Textbook of Radiographic Positioning and Related Anatomy Sample Practice Questions + Test Bank

    Bontrager’s Textbook of Radiographic Positioning and Related Anatomy Sample Practice Questions + Test Bank

    29 December 2025

  • Local Artist Programs for Office Walls | Artesty Guide

    Local Artist Programs for Office Walls | Artesty Guide

    27 January 2026

  • ATI Proctored Exam Explained: Format, Scoring & What to Expect

    ATI Proctored Exam Explained: Format, Scoring & What to Expect

    22 January 2026

  • Sterile Processing Technician vs. Surgical Technologist: What’s the Difference?

    Sterile Processing Technician vs. Surgical Technologist: What’s the Difference?

    22 January 2026

  • Best Diamond Stud Earrings to Buy Under $800

    Best Diamond Stud Earrings to Buy Under $800

    20 January 2026

  • Hide Expert VPN: Privacy and Data Protection Online

    Hide Expert VPN: Privacy and Data Protection Online

    20 January 2026

Tags

  • Reflection on Convey Three Levels of Maturity

IMPORTANT LINKS

  • How To Upload Class Notes
  • Selling Tips
  • Passing Grades's Study Materials
  • Scholarships for International Students 2025

POPULAR CATEGORIES

  • Law
  • Accounting
  • English
  • Psychology
  • Business
  • Nursing
  • Computer Science
  • General

View Document

  • Blog
  • Contact
  • Delivery Policy
  • Latest Scholarships Around the World
  • How to Pass Bar Exams: Passing Grades’ Strategies
  • How to Study and Pass the CPA Exam
  • All Test Banks
  • Faq
  • Copyright Claims
  • Privacy Policy
  • Terms of Use

KNOWLEDGE BASE

  • How to Write A+ Grade Good Research Paper
  • How to Manage Stress During Exam Period
  • Best Time to Study
  • How to Pass NCLEX-RN Exam
  • How To Effectively Utilize Test Banks
  • Popular Shadow Health Exam Assessments
  • Popular HESI Case Studies
  • How to Prepare for a Nursing Career
  • The Importance Of Summaries in Exam Revisvion

© 2026 Pasing Grades. All rights reserved.